daen

Data centre design and engineering

A data centre is only as good as its design. dba consult is a Danish data centre consultancy that finds freelance data centre design consultants who plan power, cooling and IT as one system before ground is broken, so capacity, redundancy and energy use fit together from the start.

Fountain with bronze storks on a patterned square with a palace tower in evening light behind it.
The Stork Fountain on Amagertorv. Photo: dba consult

We clarify which part of the design the consultant will be responsible for and how the work fits with your advisers, contractors and in-house specialists.

Design

What the design must answer

Capacity and power density

How many kW per rack now, and how much later.

Redundancy

The level for power and cooling, and what must be maintainable during operation.

Cooling

Air, liquid or a mix, and how waste heat can be reused.

Network and fibre

Routes, rooms and space to grow.

Energy

Expected PUE and supply from the grid.

From design to operation

The design is the first part of the project. Construction, commissioning and operation follow once it is in place. See Data centres and factories for the full process and the Insight on commissioning in five levels.

Red-brick building with green spires behind trees on the harbour quay under clouds.
The inner harbour by Langebro. Photo: dba consult

Assignments

Typical assignments

The assignments range from concept design to review before tender.

Which assignment looks like yours?

Liquid cooling in an existing hall

Engineering liquid cooling in an existing hall.

The need
More cooling without building a new hall.

The role
Engineering consultant for cooling.

Technical focus
Liquid cooling, piping and operation during the rebuild.

Design review before tender

Design review before tender, so drawings and requirements match.

The need
Tender documents without gaps between disciplines.

The role
Independent review of the design.

Technical focus
Power, cooling, IT and tender requirements.

Waste heat to district heating

A plan for waste heat to the district heating network.

The need
Reuse of the heat from the data centre.

The role
Heat recovery consultant in the design.

Technical focus
Cooling, heat pumps and connection to district heating.

Network and fibre routes

Design of network rooms and fibre routes in a new hall.

The need
Room and routes for the network, also as the hall grows.

The role
Network design consultant in the construction project.

Technical focus
Fibre routes, network rooms and redundant connections.

Contact

Planning a data centre?

Tell Claudio briefly about the facility, the phase and what the design must achieve. We will take the rest in the conversation.

Claudio Piron, pharma and data centres, dba consult

Data centres and critical infrastructure

Claudio Piron

53 53 24 28

claudio@dba-consult.dk

Questions and answers

What clients often ask

What does a data centre design consultant do?

The consultant takes responsibility for a defined part of the engineering, such as power, cooling or networking, and makes sure the design can be built, tested and operated.

When should the design consultant join the project?

Before tender. Design errors cost more with every phase the project moves on.

Can the consultant work with our consulting engineer?

Yes. We agree the responsibilities up front, so the consultant complements your advisers rather than overlapping them.

How quickly can you find a consultant?

We aim to present a relevant candidate within 48 hours once the assignment is clarified.